CrealCritter
Sustainability Master
- Joined
- Jul 16, 2017
- Messages
- 11,214
- Reaction score
- 22,028
- Points
- 387
- Location
- Zone 6B or 7 can't decide
Just curious did you also do rat wire on the floor? CCX are lazy and I was always conserned about them not moving and getting injured when the tractor is moved.